99re这里只有精品视频这里只有精品-99ri9-99ri国产-99ri精品-99rr这里只有精品-99r精品视频只有精品高清6

Shanghai Cuckoo Automatic&Science Co., Ltd.
中文版 English Feedback
Tel:021-55152032
The latest
Contact us
  • tel:021-55152032
  • Fax:021-55152036
  • E-mail:[email protected]
  • Address:Room 328, Building 2, No. 6 Luanchuan Road, Baoshan District, Shanghai
Correct installation and application of electromagnetic flow

Installation of electromagnetic flow meter

It is important to ensure the accuracy of the electromagnetic flow meter.

In order to ensure that the transmitter measuring tube filled with the measured medium, the best vertical installation, flow from bottom to bottom, especially for liquid and solid two-phase flow, must be vertical. If the site only allows horizontal installation, it must ensure that the two electrodes in the same horizontal plane

The transmitter should be installed in the indoor dry and ventilated place, avoid the installation in the environment temperature is too high, should not be strong vibration, as far as possible to avoid strong magnetic field equipment, such as large motor, transformer and so on.

Measured by the electromagnetic flow transducer electrode of a few millivolts AC voltage is to document.write ('') transmitter document.write ('') liquids the potential for foundation. In order to make liquid stable potential and transmitter and maintaining a fluid potential, in order to ensure stable are measured, the transmitter shell and the metal pipe ends should be well grounded, the converter shell should be grounded. Grounding resistance cannot be greater than 10, and other electrical equipment connected a common ground wire. If the transmitter housing is not guaranteed to be in good contact with the metal pipe, the metal conductors are used to connect them.

The transmitter should be installed at both ends of the valve and bypass.

Fifthly, in order to avoid signal interference and document.write ('') transmitter document.write ('') and a converter between the signal must be shielded wire transmission is not permitted. The signal cables and power lines parallel placed in the same cable pipe. Signal cable length shall not be more than 30 m.

The converter in installation site of avoiding, DC magnetic field and vibration, ambient temperature of - 20 to 50 DEG C, does not contain corrosive gases, relative humidity is less than 80%.

Seventhly, in order to avoid the velocity relative measurement, the flow control valve should be set in the downstream of the transmitter. For small caliber document.write ('') transmitter document.write (''), because the distance from the center electrode to the flow meter inlet has equivalent to several times the diameter D of length, so the upstream pipe can not. But to a larger diameter flowmeter, general upstream above should be 5D straight section downstream generally do not straight sections requirements


Top
主站蜘蛛池模板: 亚洲av中文无码乱人伦在线视 | 色妞色视频 | 91香蕉视频国产app免费精品下 | 国产综合一区二区三区 | 动漫无遮挡h纯肉亚洲资源大片 | 日本特级婬片中文免费看 | 人妻丰满精品一区二区a片 人妻丰满熟 | 99久久国产精品一区二区 | 蜜臀色欲av无码国产精品 | 国产鲁鲁视频在线播放 | 国产精品女优在线 | 欧美国产日韩a欧美在线 | 国产黄色小视频在线观看 | 无码专区久久五月天 | 成人性生交大片免费看黄9.1 | 国产精品美女乱子伦高潮 | 最新中文字幕第一页 | 亚洲av无码久久精品日韩一区 | 日韩精品无码中文字幕一区二区 | 亚洲色无码专区在线播放 | 91成人亚洲综合欧美日韩 | 国产麻豆剧传媒精 | 亚洲高清无码三级片 | 日本有码中文字幕第一页在线播放 | 成人午夜亚洲影视在线观看 | 国产精品拍天天在 | 日本在线观看一区二区三区 | 欧美成人看片黄a免费看 | 亚洲日本va中文字幕久久 | 欧美a色爱欧美综合v | 精品欧洲av无码一区二区三区 | 日本中文字幕亚洲乱码视频 | 曰韩人妻无码一区二区三区综合部 | 精品人妻系列无码一区二区三区 | av成人 | 国产午夜成人av在线播放 | av无码中出一区二区三区 | 免费在线观看一区 | 国产精品亚洲欧美日韩区 | 国产成人精品电影在线观看 | 一区二区亚洲国产精品 |